- Analysis of obstacles during aerial surveys
- Runway intrusion improvement measures
- Airfield safety measures
- Phase construction and construction planning for the flight zone
It mainly refers to the arrangement of runways, parallel taxiways, quick exit taxiways, connecting taxiways, lifting belts, aprons and airfield drainage systems. The runway is the most important part, and its arrangement is determined by the number and orientation of runways.





